This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| observation:2026campaign [2025/12/11 19:51] – [Available instrumentation for 2026] etienne | observation:2026campaign [2025/12/16 12:33] (current) – etienne | ||
|---|---|---|---|
| Line 2: | Line 2: | ||
| ===== 2026 observing campaign ===== | ===== 2026 observing campaign ===== | ||
| + | |||
| + | <color red > ** The call for the 2026 observing campaign is now open! ** </ | ||
| THEMIS 2026 observing campaign will take place approximately from early September to mid-November, | THEMIS 2026 observing campaign will take place approximately from early September to mid-November, | ||
| Line 8: | Line 10: | ||
| The 2026 campaign shall observe the following schedule: | The 2026 campaign shall observe the following schedule: | ||
| - | * December 2025: opening of call to apply for observation | + | * December |
| - | * ** January | + | * ** January |
| - | * ** February | + | * ** Friday |
| * March 2026: observation time allocation announced to applicants | * March 2026: observation time allocation announced to applicants | ||
| * Spring 2026: commissioning of the [[technical: | * Spring 2026: commissioning of the [[technical: | ||
| Line 18: | Line 20: | ||
| ==== Call for observation time during the 2026 campaign | ==== Call for observation time during the 2026 campaign | ||
| - | |||
| - | <color red > ** The call for the 2025 observing campaign is now open! ** </ | ||
| Interested researchers are encouraged to check the **[[# | Interested researchers are encouraged to check the **[[# | ||
| Line 28: | Line 28: | ||
| The submission of proposals is specific to the category of users one belongs, based on [[: | The submission of proposals is specific to the category of users one belongs, based on [[: | ||
| - | * " | + | * " |
| - | * Interested observers shall complete the **[[http:// | + | * Interested observers shall complete the **[[http:// |
| - | * Deadline: February | + | * Deadline: |
| * " | * " | ||
| * Applicants shall follow the instructions of the **[[http:// | * Applicants shall follow the instructions of the **[[http:// | ||
| - | * Deadline: January | + | * Deadline: January |
| - | * " | + | * " |
| - | * Interested observers shall complete the **[[http:// | + | * Interested observers shall complete the **[[http:// |
| - | * Deadline: February | + | * Deadline: |
| As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the spring of 2026, the integration of [[technical: | As soon as the appropriate proposal refereeing procedures of each community and TAC have been passed, applicants shall quickly be informed of their application outcomes. During the spring of 2026, the integration of [[technical: | ||
| Line 61: | Line 61: | ||
| === MTR2 in spectroscopy mode === | === MTR2 in spectroscopy mode === | ||
| - | In this mode, up to 4 (old) EMCCD Andor iXon camera | + | In this mode, up to 4 EMCCD Andor iXon cameras |
| [[technical: | [[technical: | ||
| - | * Reconstructed maps quick-look softwares are available for on site analysis. | ||
| - | |||
| === MTR2 in spectropolarimetry mode: === | === MTR2 in spectropolarimetry mode: === | ||
| Line 70: | Line 68: | ||
| Regarding the available analysis software: | Regarding the available analysis software: | ||
| - | * A Stokes | + | |
| - | * Thanks to V. Bommier, a basic magnetic field inversion software package (running locally in IDL) is available. | + | === Broadband imaging (BBI) context camera: === |
| + | THEMIS BBI fast camera (40 frames/ | ||
| + | |||
| + | === Available analysis softwares === | ||
| + | |||
| + | * Knox-Thompson image reconstruction for BBI | ||
| + | * Reconstructed spectral | ||
| + | * Stokes map quick-looks | ||
| + | * Thanks to V. Bommier, a basic magnetic field inversion software package (running locally in IDL) is also available. | ||
| - | === Broadband imaging context camera: === | ||
| - | THEMIS BBI fast camera (40 frames/s) is running concurrently with the spectrograph. Current setup is for 656 nm (red), but can be changed optionally to G-band or other. | ||
| /* == 2024 known problems (and solutions) == | /* == 2024 known problems (and solutions) == | ||